As a guide, renovating a flat in Andorra costs €650 to €1,100 per square metre: an 80 m² flat comes to between €52,000 and €88,000, and the work takes 10 to 14 weeks. The gap between the low and high ends has less to do with the finishes than with how many of the services need renewing and whether partition walls, the kitchen or the bathrooms are being moved.

Where the budget goes

In a full renovation of a flat from the 1980s or 1990s, which is the most common case in Andorra la Vella and Escaldes-Engordany, the breakdown usually looks something like this:

  • Services (plumbing, electrics, heating): between a quarter and a third.
  • Kitchen and bathrooms: the most variable item. A complete bathroom runs from €6,500 to €12,000 and a kitchen from €9,000 to €18,000.
  • Building work, flooring and wall finishes.
  • Interior and exterior joinery. Replacing the windows pushes the price up, but it is what makes the biggest difference to the heating bill.
  • Painting, finishing touches and final clean.

Renewing the plumbing and the consumer unit while the walls are open costs 20 to 30% less than doing it separately later. That is why we almost never recommend a purely cosmetic renovation in a flat that still has its original services.

Permits: the Comú and the owners' association

Building work is processed by the Comú (the parish council) of the parish where the property is located. Broadly speaking, there are two situations:

  • Minor works: jobs that do not affect the structure, the façade or the layout, such as replacing floors, tiling, painting or refitting a kitchen without moving partition walls. The paperwork is straightforward.
  • Major works: when the layout, the structure, the façade or the use is altered. This needs plans signed by a qualified professional, and the decision takes longer.

Each Comú has its own by-laws, its own fees and, in some tourist areas, times of year when noisy work is restricted. We check this for each job before setting the schedule. You also need to notify the building's owners' association, keep to the building's permitted working hours and agree on the use of the lift and the removal of rubble.

How long it takes, stage by stage

  1. Visit, measurements and quote: one or two weeks.
  2. Permits and ordering materials: two to six weeks, depending on the type of work. This is where a badly planned renovation loses the most time.
  3. Demolition and services: two or three weeks.
  4. Building work, flooring and tiling: three or four weeks.
  5. Joinery, kitchen, sanitaryware and painting: three or four weeks.
  6. Final snagging and handover.

In a country where much of the material has to be brought up from outside, ordering the kitchen, the windows and the sanitaryware in good time avoids dead weeks halfway through the job.

How to avoid cost overruns

  • A fixed, itemised quote, with qualities and models in writing.
  • Decide on the layout, kitchen and bathrooms before starting, not during the work.
  • A contingency sum agreed from the outset for whatever turns up when the walls are opened.
  • A single person in charge who coordinates all the trades.
  • Any change in writing, with its price, before it is carried out.

Using the work to cut your energy use

With the flat empty, it is the moment to insulate the external walls from the inside, replace the windows and swap the heating-oil boiler or electric radiators for a more efficient system. We explain the options in our guide to heat pumps in Andorra. The Andorran Government offers grants for the refurbishment and energy improvement of buildings; the conditions vary with each call for applications, and it is worth checking them before finalising the project.

You will find the details of the service under full renovations in Andorra. For an initial assessment, send us through the form the parish, the floor area and a few photos of the current condition.

Frequently asked questions

How much does it cost to renovate an 80 m² flat in Andorra?

As a guide, between €52,000 and €88,000, that is, €650 to €1,100 per square metre depending on the quality of the finishes and the services that need renewing.

Do I need a permit to renovate a bathroom or a kitchen?

Building work is either notified to or applied for at the Comú (the parish council). If the structure, façade and layout are not affected, it is usually treated as minor works, with straightforward paperwork.

Can I live in the flat during the renovation?

For a full renovation it is not advisable: the water and electricity are cut off at times, and there is dust and noise. Partial renovations can be organised in stages so that one bathroom stays in use.

More guides

Would you like us to take a look?

The advisory visit and the quote are free. Send us a few photos and tell us which parish you are in.

Get a free quote